Kölner Rapid Stone Mason is specifically developed for stone mason requirements. The adhesive is applied undiluted in two layers with a brush. After approximately 15 minutes of drying (depending on the thickness of the Rapid layer, temperature, and relative humidity), you can apply a second layer of Rapid or start gilding. Beware that the Rapid layer must be completely dry before gilding. After that, you have three days of open time to make a high-quality gilding.
In New Zealand, gold lettering on headstones usually uses 23-carat or 24-carat gold leaf pressed into sandblasted engravings. This finish lasts about 10 to 15 years, depending on the stone type and the weather. To gild a headstone with Kölner Rapid Stone Size, brush the undiluted, water-based adhesive onto clean, dry, grease-free chiselled or sandblasted letters. Wait about 15 minutes until it dries and feels tacky, then press the gold leaf into place. You have up to 8 hours to apply the gold leaf after the adhesive is ready.
1. Surface Preparation
- Clean the stone: Use a soft brush or gentle cleaner to get rid of any old gilding, dirt, debris, or grease from the carved or sand-blasted letters.
- Dry completely: Make sure the engraved lettering area is fully dry before you apply any product.
- Seal (if needed): If the stone is very porous, apply a stone sealer first. This helps prevent the stone from soaking up the adhesive.
2. Applying Kölner Rapid Stone Size
- Pick your colour: Use either Kölner Rapid Stone Size Yellow or Clear. Yellow gives a warm, forgiving base under the gold leaf.
- Use it as is: Do not add water. Brush on one smooth, even coat directly into the letters with a fine synthetic brush, like a cat tongue brush for detailed edges.
- For porous surfaces: If the stone is very porous, you may need to add a second coat of Rapid Size after the first one dries.
3. Curing And Tack Time
- Let the size dry for about 15 minutes. The exact drying time can change depending on the air temperature and humidity.
- Make sure the layer is fully dry and clear before you apply the leaf.
- After it dries, you have up to 8 hours to finish the gilding.
4. Laying The Gold Leaf
- Apply the leaf by gently pressing transfer gold leaf or loose leaf, using at least 23-carat gold for outdoor durability, onto the tacky letters.
- Press down with a soft brush or Kölner Tissue to make sure the transfer paper or leaf gets into the V-cuts and corners of the engraving.
- Brush away with mop/duster any extra gold leaf from the stone’s surface outside the letters, and lightly polish. If you use high-karat gold (23ct or higher), you do not need a protective top coat. Lower-carat gold or silver leaf may need sealing to prevent tarnish.





















